Future development area requires separate sewer system with rainwater retention basin
The Main-Post reports on a future development area in Himmelstadt that must be revised due to a necessary separate sewer system with a rainwater retention basin. According to the report, structural development could begin after the resolution of the bylaw; this makes the article a clear match for construction and residential area development in Himmelstadt.





